Bridge on the Po river close to Castelvetro
1979-1972 (1675 m) – Scheda tecnica
- Piers in the riverbed – View of the piers during a flood of the Po river
- Launching bridge – Deck constitued by Gerber pre-stressed concrete beams supported by reinforced concrete piers. View of the sytem used to precast and launch the beams in situ.
- Concrete transport system – Rafts used to transport the concrete to the piers locations
- Piers casting – Piers casting in the middle of the river
- Pre-stressed concrete beams – Beams up to 86.5 m long, 4.1 m wide, and weigh up to 440 t
- Piers in the floodplain – Extension of the bridge in the floodplain with tapered piers during a flood