Viaduct crossing the city of Bolzano
1964-1972 (2480 m) – Scheda tecnica
- Construction of the viaduct – View of the piers and the advancing deck
- Along the river – The viaduct along the Eisack riverbed
- Beam moving scaffhold – Precasted beam sections connected using pre-stress cables and placed using a moving scaffhold
- Piers with reduced width – 5 m wide pier crossection at the base compared to the 24m wide deck to minimize the used city soil
- Crossing the city – Panormic view of the city of Bolzano and the completed motorway viaduct
- Along the river – The viaduct along the Eisack riverbed